Private and Confidential
Every component you have assessed, ordered by whether you can still buy it
Each mark is one component. Height follows the consequence of its failure. Copper marks a component running on a workaround today. Select a band to filter the register.
Replacement route intact or unresolved Running on a workaround now Taller mark, heavier consequence if it fails

Exposure

Supportability against consequence

Exposure is the supportability score multiplied by the consequence score. It is not a risk rating and it does not replace your own criticality classification. An undetermined supportability position scores the same as a conditionally supported one, because an unknown is treated as an exposure until it is closed. Select any cell to filter the register.

Where to begin

Tranche 1 candidates

    Rights position

    Mandatory on every entry

      This is a record of enquiry, not a legal opinion. Where consent is required it is obtained through you, because you hold the manufacturer relationship and the leverage.

      Longest lead times observed

      Weeks

        Register readiness

        Tests before issue

        Register

        Approvals

        Nothing reaches the operator until a technical manager has signed it, and nothing proceeds to digitisation or manufacture until the operator has responded. Your own queue appears first.

        Settings

        Customers, installations, people and permissions. Changes here take effect immediately across the register.

        Basis and method

        Read this before interpreting anything in the register.

        Scoring, in full

        Standing verification items

        Two items remain open and must be closed before the corresponding entries are relied upon outside this workspace. The first is the API 20S specification level, processes and materials to which Arridex qualifies. The second is the conclusion of the independent audits of the Omnifactory by DNV and by ASTM. Until they conclude, the position is that the audits are under way and the certifications are not held.

        Exclusions

        Grounds on which a component is excluded from the additive route. These are stated at the outset, before your technical authority has to name them. A limit declared early builds standing. A limit discovered late destroys it.

        Mobile advanced manufacturing unit

        Designed limit: polymer and composite processes only. Metal powder work remains at the Omnifactory, because metal powder handling offshore is an explosion and inhalation hazard, and area classification governs. This limit is designed in rather than discovered on deployment.